MPN IPM-8221
Art.nr. W128807251
EAN/UPC 5715063288740
Voorraadniveau
Fulfilling Your Power Requirements with IP-enabled Power Outlets
PLANET IPM-8221 stands out as an 8-port IP Power Management (IPM) device, designed to efficiently handle power distribution for a versatile array of connected devices. Leveraging cutting-edge IP-based technology, PLANET has transformed conventional power management equipment into genuine networking devices. PLANET IPM-8221 can be monitored by PLANET's Universal Network Management System (UNI-NMS) and by smart discovery uti...
Hardware
.1U rack-mount size design
.IEC outlet models
.8 power outlets that support real-time current image monitoring
.LCD panel displays current, voltage, energy, network and environment information
.Optional button to lock-up protection to avoid modification
.Circuit breaker can avoid damage that is caused by overload
.LCD display to visually display the operating status of ports and PDU
.Each PDU can supply a maximum load of 3840W with 255 PDUs cascaded
.Enhanced with an environmental sensor to provide a temperature alert via email
Metal
Managed, Switched
Black
1U
CE, FCC
Yes
Yes
0 - 90 procent
0 - 60 °C
C13 coupler, C19 coupler
8 AC-uitgang(en)
16 A
100 - 240 V
1,84 kg
15,9 cm
4,45 cm
44,2 cm
1 Ja(a)r(en)
Fulfilling Your Power Requirements with IP-enabled Power Outlets
PLANET IPM-8221 stands out as an 8-port IP Power Management (IPM) device, designed to efficiently handle power distribution for a versatile array of connected devices. Leveraging cutting-edge IP-based technology, PLANET has transformed conventional power management equipment into genuine networking devices. PLANET IPM-8221 can be monitored by PLANET's Universal Network Management System (UNI-NMS) and by smart discovery utility to help IT staff to remotely monitor all network devices and PDs' operational status.
Intelligent Power Management
The IPM-8221 boasts 8 customizable power outlets that can be operated independently. It can monitor power usage via the SNMP, web interfaces, or the optional button to select the LCD panel display. This flexibility enables users to efficiently access, configure, and manage multiple networking devices remotely, saving valuable time and resources.
Real-time Current Monitoring
The LCD panel on the unit shows the aggregate current drawn from a power outlet. This feature aids installers in preventing overloaded circuits by issuing a visible warning when the current draw approaches the strip's maximum amperage.
Scheduled Power On/Off
The IP-based Switched Power Manager empowers users to pre-define power schedules for IT equipment. It provides advance notice of an impending shutdown, allowing users a designated timeframe to complete tasks before the power-off sequence begins.
Enhanced Overload Protection
Unlike conventional Power Distribution Units (PDUs) that risk cutting off the entire circuit during power overload, PLANET PDU takes a proactive approach. Equipped with a built-in circuit breaker and reset switch, it ensures stable power distribution among connected equipment. The 16-amp circuit breaker acts as a safeguard against dangerous overloads, preventing potential damage to valuable equipment.
Enabling Environmental Monitoring with Precision
The IPM-8221 goes beyond power management by offering dedicated port for ambient Temperature and Humidity (T/H) sensor (sensor provided with product). This thoughtful addition allows you to seamlessly integrate environmental monitoring into your infrastructure. By connecting compatible sensor to the provided ports, you gain valuable insights into the conditions of your surroundings, ensuring optimal performance and safeguarding your equipment.
Streamlined Connectivity with Cascade Ports
Elevate your networking experience with the IPM-8221's Cascade Input/Output Port, ideal for seamlessly linking RJ45 inputs to the other one. This enables smooth integration of multiple PDUs, optimizing your network infrastructure.
Efficient Energy Management for Cost Savings
Within the configuration interface of the IPM-8221, you have the ability to monitor the current energy consumption in your office. This feature empowers you to make informed decisions to reduce energy usage, ultimately leading to significant savings on utility expenses.
Learn more: https://www.planet.com.tw/en/product/ipm-8221
*Bovenstaande productgegevens zijn aangeleverd door Icecat. EET kan hiervoor niet aansprakelijk gehouden worden.